Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
dido:00-sip-ra:03-adoption-process:03-1-introduction:start [2026/07/11 11:11] – ↷ Links adapted because of a move operation nick_didodido:00-sip-ra:03-adoption-process:03-1-introduction:start [2026/07/11 11:15] (current) – ↷ Links adapted because of a move operation nick_dido
Line 3: Line 3:
 [[dido:00-sip-ra:03-adoption-process:start|Return to Adoption Process]] [[dido:00-sip-ra:03-adoption-process:start|Return to Adoption Process]]
  
-[[https://www.omg.org/|OMG]] decides which specifications to adopt via votes of its Membership. The selected specifications should align with [[dido:99_annexes:99_annexes:annex-b-terms-and-definitions:m:mda|MDA]]'s architectural vision. OMG bases its decisions on both business and technical considerations. Once OMG adopts a specification, OMG makes the specification available for use by both OMG members and non-members alike, at no charge.+[[https://www.omg.org/|OMG]] decides which specifications to adopt via votes of its Membership. The selected specifications should align with [[dido:99_annexes:annex-b-terms-and-definitions:m:mda|MDA]]'s architectural vision. OMG bases its decisions on both business and technical considerations. Once OMG adopts a specification, OMG makes the specification available for use by both OMG members and non-members alike, at no charge.
  
 Section 3 provides an extended summary of the RFP process. For more detailed information, see the Policies and Procedures of the OMG Technical Process [P&P], specifically Section 4.2, and the OMG Hitchhiker’s Guide [Guide]. In the event of any inconsistency between this document, the Hitchhiker's Guide, and the Policies and Procedures, the P&P is always authoritative. OMG's Intellectual Property Rights Policy [IPR] governs all IPR-related matters. Section 3 provides an extended summary of the RFP process. For more detailed information, see the Policies and Procedures of the OMG Technical Process [P&P], specifically Section 4.2, and the OMG Hitchhiker’s Guide [Guide]. In the event of any inconsistency between this document, the Hitchhiker's Guide, and the Policies and Procedures, the P&P is always authoritative. OMG's Intellectual Property Rights Policy [IPR] governs all IPR-related matters.
  • dido/00-sip-ra/03-adoption-process/03-1-introduction/start.1783793471.txt.gz
  • Last modified: 2026/07/11 11:11
  • by nick_dido