The DIDO-TE SHALL establish the initial state of each Node before initiating a Node lifecycle transition.
The initial Node state provides the controlled starting point for subsequent lifecycle operations. It identifies the actual condition of the Node before the DIDO-TE starts, activates, suspends, resumes, stops, restarts, recovers, or terminates it.
The applicable Node Definition, Node Implementation, and Node Configuration determine the permitted initial states and the criteria for establishing them.
An unknown, ambiguous, unauthorized, or unsuitable initial state prevents the DIDO-TE from determining whether a requested lifecycle transition is valid. Residual processes, data, connections, locks, resources, or configuration from an earlier operation may also affect subsequent Test Execution.
Establishing and recording the initial state supports lifecycle control, reproducibility, fault isolation, recovery, Evidence, and Traceability.
Verification confirms that:
Verification includes:
Assign the applicable delivery phase.
Draft
Use the following syntax to reference this requirement’s Statement section from another DokuWiki page:
{{section>dido:03-dido-te:99-annexes:annex-c-requirements:03-node-requirements:nod-004-control-the-node-lifecycle:nod-004a-establish-the-initial-node-state#Statement&noheader&nofooter&noeditbtn}}
© 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc.