====== P4-REQ-21-2-003 ====== [[dido:99_annexes:annex-d-requirements:part-04:start| Return to Requirements]] ===== Statement ===== The Phase 0 Implementation Profile / PSM SHALL preserve traceability to the Part 1 Conceptual Architecture, the Part 2 Distributed Node-Based Logical Architecture / PIM, and the Part 3 FX Demo Logical Profile. ===== Source ===== Part 4, Section 21.2: Phase 0 Profile Requirements. ===== Rationale ===== Phase 0 is part of a layered architectural progression. Preserving traceability to Parts 1, 2, and 3 ensures that implementation decisions remain connected to their conceptual, logical, and FX-specific logical sources. This traceability allows reviewers to determine how Phase 0 implementation choices derive from and remain consistent with the preceding architectural layers. ===== Applies To ===== This requirement applies to: * Phase 0 implementation mappings; * implementation artefacts; * implementation traceability records; * implementation governance; and * architectural review of the Phase 0 baseline. ===== Verification ===== Verification SHALL confirm that the Phase 0 Implementation Profile / PSM preserves traceability through Parts 1, 2, and 3. Verification activities should include review checks confirming that: * Phase 0 implementation artefacts trace to applicable Part 3 elements; * applicable Part 3 elements retain their Part 2 logical traceability; * applicable Part 2 elements retain their Part 1 conceptual traceability; and * implementation mappings do not break the established architectural traceability chain. ===== Traceability ===== This requirement preserves the architectural traceability chain from conceptual architecture through logical architecture and the FX Demo Logical Profile to Phase 0 implementation. Related requirement identifiers: * [[dido:99_annexes:annex-d-requirements:part-04:p4-req-21-2-002]] * [[dido:99_annexes:annex-d-requirements:part-04:p4-req-21-2-004]] * [[dido:99_annexes:annex-d-requirements:part-04:p4-req-21-2-008]] Related source section: * [[fxdemo:04-part:21-phase-0-implementation-requirements:21-2-phase-0-profile-requirements:start]] ===== Status ===== Draft ---- © 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc.