====== C2 - Crucible Concept of Operations ====== [[dido:02-crusible:99-annexes:annex-b:start|Go to Annex B: References]] ===== Citation ===== Dido Solutions, Inc. and Jackrabbit Consulting, Inc., //Crucible Concept of Operations (ConOps)//, Version 1.0 Accepted, 6 June 2026. ===== Reference Identifier ===== [C2] ===== Document Title ===== Crucible Concept of Operations ===== Document Type ===== Concept of Operations ===== Version ===== Version 1.0 ===== Date ===== 6 June 2026 ===== Issuing Organizations ===== * Dido Solutions, Inc. * Jackrabbit Consulting, Inc. ===== Description ===== The Crucible Concept of Operations describes how Crucible is intended to operate. The document defines the Phase 1 operational concept in which the ''forge'' command-line utility runs non-interactively as one or more CI/CD pipeline steps. It describes baseline composition, Machine Image construction, dependency and compliance-finding capture, infrastructure deployment, connected-to-disconnected transfer, and compliance Evidence generation. The document also records the future Phase 2 web-management concept and the strategic, unscheduled direction toward increased native execution. The Concept of Operations contextualizes the [[dido:02-crusible:99-annexes:annex-b:cr-001|[C1] Crucible System Requirements Specification]] and remains subordinate to the System Requirements Specification and the Engineering Constitution. Where the Concept of Operations conflicts with an approved requirement, the approved requirement controls. :contentReference[oaicite:0]{index=0} ===== Document Status ===== Accepted The project owner accepted Version 1.0 on 6 June 2026. ===== Operational Concepts ===== The Concept of Operations addresses: * Phase 1 command-line operation * CI/CD pipeline integration * Image-layer baseline composition * Infrastructure baseline composition * Optional application source * Machine Image construction * Dependency capture * Compliance-finding capture * Infrastructure deployment * Connected-to-disconnected transfer * Offline package-repository population * Compliance Evidence supporting SCTM, RMF, and ATO activities * Phase 2 web management * Strategic native execution ===== Related Requirements ===== The Concept of Operations provides operational context for: * FR-BAS-001 through FR-BAS-004 * FR-DSO-001 through FR-DSO-006 * FR-DEPC-001 through FR-DEPC-005 * FR-AG-001 through FR-AG-005 * FR-COMP-008 through FR-COMP-010 * FR-UI-001 through FR-UI-002 * INT-001 * INT-002 * FUT-007 through FUT-009 ===== Related Architecture Decisions ===== The Concept of Operations identifies relationships to: * ADR-003, Baseline Composition * ADR-004, Dependency Capture and Offline Transfer * ADR-005, Operating-System-Agnostic Compliance Engine * ADR-006, Native Execution Strategy * ADR-007, Interface Phasing ===== Related Documents ===== * [[dido:02-crusible:99-annexes:annex-b:cr-001|[C1] Crucible System Requirements Specification]] * [[dido:02-crusible:99-annexes:annex-c-requirements:start|Annex C: Requirements]] ===== Citation Format ===== Use the following link when citing this reference: [[dido:02-crusible:99-annexes:annex-b:cr-002:start|[C2]]] For a requirement ConOps Relationship section: ===== ConOps Relationship ===== The Crucible Concept of Operations describes this requirement as part of the Phase 1 CI/CD-embedded workflow [[dido:02-crusible:99-annexes:annex-b:cr-002:start|[C2]]]. ---- ===== Notes for Editors ===== Maintain this page as the stable citation target for the Crucible Concept of Operations. Update the version, date, document status, and citation when a new controlled revision supersedes Version 1.0. Preserve the reference identifier [C2] and the namespace ''cr-002''. Do not rename this page once it has been cited externally unless a redirect or move plan is in place. ---- © 2026 Dido Solutions, Inc. and Jackrabbit Consulting, Inc.